IICP Technical Guidance Manual (TGM)
The District has developed a Technical Guidance Manual (TGM) to provide satellite entities assistance on the IICP requirements and compliance.
Article 8. Infiltration / Inflow Control Program
A Long Term Operation and Maintenance Program and Private Sector Program outline has been developed to indicate minimum requirements and aid in the creation of these programs.
Appendix D includes sample completed report forms and program templates.
Individual Appendix D sample completed report forms and program templates.
Sample Short Term Requirements Annual Summary Report
Sample Condition Assessment Prioritization Form
Sample Status of High Priority Deficiencies Form
Sample SSO and/or BB Satellite Entity Internal Summary
Sample Sewer System Description and Inventory
Sample Long Term Operation & Maintenance Program (LTOMP) Annual Summary Report
NAASCO Pipeline Assessment & Certification Program (PACP)© Code Summary
Sample Capital Improvement Plan (CIP)
Sample Private Sector Program (PSP)
Sample Private Property Inspection Checklist
Template Long Term Operation & Maintenance Program (LTOMP)
The IICP TGM makes references to the 1989 Manual.
Operation and Maintenance Manual for Separate Sanitary Sewer Systems, MWRD, 1989