
From left: U.S. Environmental Protection Agency Region 5 Administrator Anne Vogel, Metropolitan Water Reclamation District of Greater Chicago Board of Commissioners President Kari K. Steele, Board of Commissioners Vice President Patricia Theresa Flynn, Commissioner Cameron Davis, Commissioner Beth McElroy Kirkwood, Commissioner Eira L. Corral Sepulveda and Commissioner Precious Brady-Davis break ground on Battery E at the Terrence J. O’Brien Water Reclamation Plant in Skokie on Oct. 8, 2026. (Claire Murphy/Pioneer Press)
Nearing 100 years of operation at its Terrence J. O’Brien Water Reclamation Plant in Skokie, the Metropolitan Water Reclamation District of Greater Chicago (MWRD) is investing in a new water treatment system, one officials say will ensure cleaner water and prepare for future regulatory requirements and another century of service for more than a million people across 143 square miles to whom the plant serves every day.
Battery E, as the district labels it, is the fifth battery, or group of treatment tanks and associated infrastructure equipment, to be constructed at the site.
The project, which broke ground Oct. 8, is a nearly $400 million investment by the water district, one of the largest to date in MWRD’s 137-year history, according to officials.
“O’Brien Plant was opened in 1928 and a lot of the infrastructure you see around here has been around since 1928, so it’s aging, it needs maintenance and rehab,” said Aruch Poonsapaya, a managing engineer for the plant.
“But also the key driver [in this new battery] is nutrient removal,” Poonsapaya told Pioneer Press.
Battery E will utilize advanced technology to significantly reduce the amount of phosphorus present in the waste and stormwater the plant treats and later returns to the North Shore Channel of the Chicago River system from residents’ sinks and drains, Poonsapaya said.
“Phosphorus is essential to life, but too much phosphorus, as most of us know…can fuel excessive algae growth, reduce oxygen levels and harm aquatic ecosystems,” MWRD Board of Commissioners President Kari K. Steele told leaders from Skokie, Evanston and the U.S. Environmental Protection Agency at Battery E’s Oct. 8 groundbreaking ceremony.


